Monday, June 15, 2026

NPC to conduct urgent maintenance work in Broad Street

Date:

Share post:

The National Petroleum Corporation (NPC) has advised that urgent maintenance work will be conducted in collaboration with the Ministry of Transport and Works in Broad Street, Bridgetown, from Tuesday, March 19, to Tuesday, April 30, between the hours of 6:00 p.m. and 6:00 a.m.

As a result, road wetting will take place nightly to reduce the impact of dust in the area and traffic will be reduced to a single lane from 6:00 p.m.

The public should exercise caution when traversing Broad Street during these night works and use an alternative route, if possible.

NPC thanks members of the public for their cooperation. (NPC/BGIS)

Related articles

Japan battle back to draw 2-2 with Netherlands in Texas thriller

Japan showed their battling qualities to eke out a 2-2 draw with the Netherlands in their World Cup...

Germany cruise to 7-1 win over debutants Curacao in Houston

Germany began their World Cup campaign with a thumping 7-1 victory over debutants Curacao on Sunday in a...

Fogging Schedule: June 15 to 19

Various districts in Christ Church, St. Thomas and St. Michael will be visited by the Ministry of Health and...

Hamilton ends Antonelli’s run with first win for Ferrari

 Lewis Hamilton celebrated an emotional and historic first grand prix victory for Ferrari on Sunday to end Kimi...