Monday, June 15, 2026

Work continues at Hampton Pumping Station

Date:

Share post:

The Barbados Water Authority (BWA) is pressing ahead with repair work at the Hampton Pumping Station in St Philip.

Crews are currently working at lifting the damaged pump out of the well. It will be replaced and a new one put into operation.

The BWA continues to urge customers to store an adequate amount of water for their households to help tide them over while the pipe-borne supply is off.

The Authority’s Water Tanker team will continue to assist residents in the districts impacted by low pressure or a water outage as a result of the work, in the interim. (PR/SAT)

Related articles

Japan battle back to draw 2-2 with Netherlands in Texas thriller

Japan showed their battling qualities to eke out a 2-2 draw with the Netherlands in their World Cup...

Germany cruise to 7-1 win over debutants Curacao in Houston

Germany began their World Cup campaign with a thumping 7-1 victory over debutants Curacao on Sunday in a...

Fogging Schedule: June 15 to 19

Various districts in Christ Church, St. Thomas and St. Michael will be visited by the Ministry of Health and...

Hamilton ends Antonelli’s run with first win for Ferrari

 Lewis Hamilton celebrated an emotional and historic first grand prix victory for Ferrari on Sunday to end Kimi...