Saturday, June 13, 2026

Update on sewage overflows on the south coast

Date:

Share post:

There has been a significant reduction in the sewage overflows along the south coast. Director of Engineering at the Barbados Water Authority, Charles Leslie, has said that the improvement in conditions is as a result of all pumps at the south coast sewerage plant now being functional.

In an interview with the Barbados Government Information Service today, Leslie also noted that a new 10-inch pump had been replaced after the previous pump was ruptured.

In a press conference on February 10, Minister with responsibility for Water Resource Management, Dr David Estwick had noted that damage to the pump stemmed from the illicit dumping of foreign objects, such as towels and meat packaging, into the sewer system.

 “Over the last couple of days, the public would have recognised that the roads are now relatively dry and that’s because all of our pumps are functioning now. All of our influent pumps, including the new 10-inch pump and all of the effluent pumps are operational as well,” Leslie said. He added that any overflow should now be minimal, until the BWA’s Waste Water Division was able to repair the compromised sewerage lines. (BGIS)

Related articles

US thrash Paraguay 4-1 for dream World Cup start

The United States opened their World Cup campaign with a 4-1 win over Paraguay on Friday, powered by a first-half...

Strong demand causes BiMPay registration delays

Thousands of Barbadians rushed to download the new BiMPay app following its launch, prompting temporary delays in the...

Not guilty of causing deaths, but of dangerous driving

Troy Emerson Nathaniel Clinton has been acquitted of causing the deaths by dangerous driving of two people in...

Elon Musk becomes world’s first trillionaire as SpaceX soars in stock market debut

Elon Musk on Friday became the world's first trillionaire after shares in his SpaceX rocket company soared during...