Thursday, April 16, 2026

Nursery Drive reopened

Date:

Share post:

ROAD WORKS along Nursery Drive, St Michael, have been completed and the road has been re-opened, but care should be exercised as speed control mechanisms have been installed.

According to a press release from the Transport Authority this evening, all Public Service Vehicles (PSVs) are instructed to enter the River Terminal from the entrance to Nursery Drive, which is on Constitution Road opposite Queen’s Park.

On exiting the River Terminal, PSVs are required to turn left on to Nursery Drive; turn right on to Constitution Road, and proceed along their assigned routes.

The public, PSV drivers and conductors are reminded that loading and off-loading of passengers must be done at the designated locations only and that parking is prohibited within the River Terminal and along Hardwood Alley. (Transport Authority/BGIS)

Related articles

Barbados advances US$80m to secure its water future

The Government of Barbados is making a US$80 million investment in modernising its water infrastructure, marking another significant...

Brush my soul making waves

By Cheryl Harewood She has spent the last 20 years as a sculptor and her work can be found...

Two Bajan-New Yorkers die in fire

Grief, shock and a deep sense of loss have gripped an East Flatbush community in the heart of...

162 detained over online praise for school shootings in Turkey

Turkish police have arrested 162 people accused of posting controversial content online about two deadly school shootings which...