Sunday, June 7, 2026

Road closure at Andrew’s Factory

Date:

Share post:

THE BARBADOS WATER AUTHORITY (BWA) wishes to inform the public the road will be closed for three week near Andrews Factory as work commences in the mains-laying project along Parris Hill and Castle Grant, St Joseph.

Starting Wednesday, the road will be closed from 7:30 a.m. to 5 p.m. each day. At the northern boundary of Andrews Factory, residents within Parris Hill will have access through the development road, while southbound traffic will be directed to re-join traffic on the highway.

Road-closed signs and detour signs will be placed along the route to guide traffic. Motorists are also asked to follow the direction of personnel on site.

The Barbados Water Authority regrets any inconvenience caused.  (PR)

Related articles

Antonelli wins Monaco from Hamilton after dramatic ending

Kimi Antonelli took a dominant victory in the Monaco Grand Prix ahead of the Ferrari of Lewis Hamilton...

11 small businesses and credit union sign deal

The Endeavour Credit Union (ECU) is seeking to extend its reach to small businesses through the launch of...

Reshelle Griffith: Dream ignited into a career

From when she was a child, Reshelle Griffith was always fascinated with fire trucks. “Growing up in Deacon’s Farm,...

Bostic drops lieutenant colonel title

Members of the Barbados Defence Force (BDF) have been challenged to protect the institution they inherited and ensure...