Vital repair work has started on the Wharf Road in The City.Today workmen were busy drilling away sections of the main roadway that was damaged during last month’s passage of Tropical Storm Tomas and has recently been closed off to vehicular traffic.Nash Lovell, the chief technical officer in the Ministry of Transport and works acknowledged that damage was “just as bad” as anticipated.He also said officials were sticking to the original timetable for completion of the remedial work.“We can confirm that there is an undermining of the wall under the road. There is other work to be done but in three to four weeks we expect repairs of the [road] surface to be carried out and completed as was previously announced,” said Lovell, noting that an official statement would be issued on Monday. (MM)
Work starts on Wharf Road
Related Articles
BCFA calls for support for Cuba at UN
The Barbados Cuba Friendship Association (BCFA) has called on Caribbean nations to support Cuba’s resolution against the United...
Flash-flood watch discontinued
The Barbados Meteorological Services has discontinued the flash-flood watch for Barbados after the threat of flash flooding diminished.
In...
Russia given first championships since Ukraine invasion
Moscow will host the 2030 World Weightlifting Championships - the first time an Olympic federation has chosen to...
Obama attacks Trump as he campaigns for Democrats ahead of midterm elections
Former US President Barack Obama has attacked the Trump administration over the Iran war and high consumer prices...


